RUIYAMACHINERY
All projects

Pakistan Formica (PVT) Ltd

Melamine Paper Production Line in Pakistan Formica Pvt Ltd

Pakistan Formica expanded its melamine paper capacity with an RY-1500B 2+4 two-step line, six oven sections, full VVVF control, and a standard speed of 25 m/min.

Region
Karachi, Pakistan
Industry
Melamine decorative paper
Project year
2018
Production line
RY-1500B 2+4 Two-Step Impregnation Line
Melamine Paper Production Line in Pakistan Formica Pvt Ltd

Project overview

01

The challenge

Pakistan Formica needed to expand capacity for 1220 mm and 1320 mm decorative paper while retaining energy-efficient operation and stable resin control.

02

Engineering solution

NTRY supplied an RY-1500B 2+4 two-step line with six oven sections, full VVVF control, and a 1500 mm metering roller for the two target paper widths.

03

Project outcome

Following customer inspection, the expanded line was commissioned in July 2018 and ran at 25 m/min with 130% resin add-on on 80 gsm decorative paper.

Source-recorded metrics

25 m/minstandard operating speed
6oven sections
1220/1320 mmraw paper widths

Data is drawn from the original project records. Final contractual parameters are governed by the project documentation.

Project gallery

Melamine Paper Production Line in Pakistan Formica Pvt Ltd 1
Melamine Paper Production Line in Pakistan Formica Pvt Ltd 2
Melamine Paper Production Line in Pakistan Formica Pvt Ltd 3
Melamine Paper Production Line in Pakistan Formica Pvt Ltd 4
Melamine Paper Production Line in Pakistan Formica Pvt Ltd 5

Engineering scope

Two-stage impregnation

Configure two dipping stages around the 2+4 process layout.

Drying and drives

Integrate six oven sections with full VVVF control.

Width and metering

Support 1220/1320 mm paper with a 1500 mm metering roller.

Project timeline

01

Capacity expansion

Defined the two-stage configuration for the required paper widths and output.

02

Inspection and manufacture

Manufactured the line and completed inspection with the customer team.

03

Commissioning

Commissioned and validated the expanded line in July 2018.